본문 바로가기

추천 검색어

실시간 인기 검색어

학술논문

해양구조물 건조계약상 공사변경(Change Order) 실무에 관한 연구

이용수 78

영문명
A Study on several issues related to the Change Order Claims in Offshore EPC Contracts
발행기관
중앙대학교 법학연구원
저자명
권도중(Kwon Do joong)
간행물 정보
『법학논문집』法學論文集 第40輯 第1號, 503~529쪽, 전체 27쪽
주제분류
법학 > 법학
파일형태
PDF
발행일자
2016.04.30
6,040

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

Recently most of the offshore construction contracts have been in the type of EPC Turnkey contract. Therefore, there would be a lot of Change Order Claims in the course of engineering, procurement and construction. The question of whether it deserve a Change Order is closely linked to the matter of whether it is within the scope of work of Contractor under the offshore construction contract. Since all the outputs of the construction are originated from the design & engineering it is of importance to know who is responsible for the design & engineering. Normally Contractor makes an amendment agreement for the transfer of all responsibilities over the design & engineering after its reviewing the basic design and FEED design delivered by Owner following the contract award. In that point, Contractor definitely has to take over the responsibilities stem from the only design, engineering and information delivered by Owner. If the Contractor’s scope of work described in a prevailing document is obscure or is very widespread it is very necessary for the Contractor to clarify its scope of work in phase of contract negotiation as the Change Order can not be allowed in circumstances where its work is within the Contractor’s work scope under the original offshore construction contract. As effects of Change Order either Contract price could be adjusted or construction period could be extended accordingly. It should be noted that observation of the procedural requirement for Change Order Request is very crucial in order for the Contractor not to be disqualified from that claim. We examine the confusing cases where work from Change Order is within the Contractor’s work scope under the original contract and also considering a few points that Contractor needs to be aware of thereon. In this article, the study on several problems arising practically from Change Order may provide good guidance for Korean shipbuilders who have been recently suffering from heavy deficit due to offshore construction contracts.

목차

Ⅰ. 서론
Ⅱ. 공사변경의 의의 및 그 절차
1. 공사변경의 개념
2. 공사변경과 작업지시권 행사의 남용
Ⅲ. 공사변경과 업무범위(scope of work)의 관계
1. 조선업체의 업무범위
2. 계약내용의 범위 내(內)인지 여부의 판단기준 및 효과
Ⅳ. 공사변경의 효과
1. 계약금액의 변경
2. 인도기일의 연장
Ⅴ. 설계변경과 관련된 구체적인 사례 유형 검토
1. 설계 자체의 하자
2. 발주자요구조건과 도면, 시방서의 불일치
3. 발주자 도면승인의 법적 의미
4. 발주자 지정 품목의 하자 발생시, 책임의 소재
5. 공사변경 시 보상의 범위 문제
Ⅵ. 맺음말

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

권도중(Kwon Do joong). (2016).해양구조물 건조계약상 공사변경(Change Order) 실무에 관한 연구. 법학논문집, 40 (1), 503-529

MLA

권도중(Kwon Do joong). "해양구조물 건조계약상 공사변경(Change Order) 실무에 관한 연구." 법학논문집, 40.1(2016): 503-529

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제