프로젝트 일정 리스크 평가 및 예측에 관한 연구

이용수 70

영문명
A Study on Assesment and Prediction of Project Schedule Risk
발행기관
한국산업경영시스템학회
저자명
성홍석(Sung Hongsuk) 박철순(Park Chulsoon)
간행물 정보
『한국산업경영시스템학회 학술대회』2011년 추계학술대회 논문집, 70~70쪽, 전체 1쪽
주제분류
공학 > 산업공학
파일형태
PDF
발행일자
2011.10.27
무료

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

In the project management context, the impotance of risk management is increasing because the risks in terms of time and cost may significantly affect the result of the project. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, then performing risk assesment with monte-carlo simulation method. However, these approach can not reflect constraints, which may be occurred during the project execution, and cope with uncertainty in the future. As these constraints may affect time and cost which are the crucial evaluation factor to the project, they must be identified and evaluated to manage the future project risk before the project is started. This paper proposes a methodology for project schedule risk management by identifying and enforcing the constraints which may be occurred in complex and uncertain project environment. First, project risk constraints are identified and categorized into time, dependancy, and branching. Then, project schedule model with constraints is converted to CPN(Colored Petri Net) which can represent all the identified constraints to assess and predict schedule risk. Finally, the expected risk of the project (in terms of time and cost) is assessed and predicted by performing Petri Net simulation. By using the methodology proposed in this paper, the risk in terms of time and cost in project schedule model can be assessed and predicted more accurately and practically than the PERT/CPM and/or Monte-carlo simulation method. Furthermore, the constraints, which may occur unexpectedly after the project launch, can be evaluated to determine the schedule risk. The expected risk can be used to decide whether risk mitigation or project termination process undertake.

목차

Abstract

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

성홍석(Sung Hongsuk),박철순(Park Chulsoon). (2011).프로젝트 일정 리스크 평가 및 예측에 관한 연구. 한국산업경영시스템학회 학술대회, 2011 (3), 70-70

MLA

성홍석(Sung Hongsuk),박철순(Park Chulsoon). "프로젝트 일정 리스크 평가 및 예측에 관한 연구." 한국산업경영시스템학회 학술대회, 2011.3(2011): 70-70

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제