학술논문
시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축
이용수 147
- 영문명
- A Study about BIM Execution Plan for Specialty Contractors at Construction Phase
- 발행기관
- 한국BIM학회
- 저자명
- 이주성(Lee JooSung) 함남혁(Ham NamHyuk) 김재준(Kim JaeJun)
- 간행물 정보
- 『KIBIM Magazine』5권 3호, 19~32쪽, 전체 14쪽
- 주제분류
- 공학 > 건축공학
- 파일형태
- 발행일자
- 2015.09.30
4,480원
구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.
국문 초록
영문 초록
For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.
목차
ABSTRACT
1. 서론
2. 이론적 고찰
3. 철근콘크리트 공사 BIM 활용성 분석
4. 철근콘크리트 업체 BIM 수행계획 개발
5. 향후 연구 진행 방향 및 결론