본문 바로가기

추천 검색어

실시간 인기 검색어

학술논문

A Project Prioritization Analysis for the Development of Inland Dry Port Projects in Malawi

이용수 0

영문명
A Project Prioritization Analysis for the Development of Inland Dry Port Projects in Malawi
발행기관
한중경제문화학회
저자명
Kondwani Thokozile Kamchacha Kyun Woo Jeong
간행물 정보
『한중경제문화연구』제24권, 233~249쪽, 전체 17쪽
주제분류
경제경영 > 경제학
파일형태
PDF
발행일자
2023.11.30
4,840

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

This analysis was aimed at analyzing the proposed inland dry port projects in Malawi to decide which of them is a priority project. This Analysis used Analytic Hierarchy Process (AHP) analysis method. It involved four alternatives and five criteria elements. According to this analysis, Nsanje project is the most priority inland dry port project with 31% priority score. The second one is Mbamba Bay project with 25% priority score. Followed by Liwonde project with 24% priority score and finally Chilumba project with 18% priority score. Criteria wise, proximity to major ports is the most priority criterion with a 29% score. Payback period and economic benefit was second important criteria with a 22% score. Bilateral and regional support is the third important criterion with an 18% score. Room for expansion and future demand had a 16% score hence being the fourth important criterion. Environmental considerations had a 15% score being the fifth important criterion. The government of Malawi should prioritize the alternatives and consider the criteria elements in the order of importance as stated and recommended in this analysis. There is also need for partnership with Korean government and companies on financing, design and development of these ports.

목차

Ⅰ. Introduction
Ⅱ. The Analytical Hierarchy Process (AHP) Model
Ⅲ. Survey
Ⅳ. Analysis Results
Ⅴ. Conclusions and Discussions

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

Kondwani Thokozile Kamchacha,Kyun Woo Jeong. (2023).A Project Prioritization Analysis for the Development of Inland Dry Port Projects in Malawi. 한중경제문화연구, (), 233-249

MLA

Kondwani Thokozile Kamchacha,Kyun Woo Jeong. "A Project Prioritization Analysis for the Development of Inland Dry Port Projects in Malawi." 한중경제문화연구, (2023): 233-249

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제