학술논문
Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations
이용수 25
- 영문명
- 발행기관
- 한국BIM학회
- 저자명
- 김현주(Kim, Hyun-Joo)
- 간행물 정보
- 『KIBIM Magazine』9권 2호, 1~10쪽, 전체 10쪽
- 주제분류
- 공학 > 건축공학
- 파일형태
- 발행일자
- 2019.06.30
4,000원
구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.
국문 초록
영문 초록
In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by buildingSMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.
목차
ABSTRACT
1. Introduction
2. Implementating a procedure for automating daily resource leveling
3. Case study
4. Refinement
5. Conclusion
Acknowledgements
References
해당간행물 수록 논문
- 건축물 평면 형상 역설계 자동화를 위한 Scan-to-Geometry 맵핑 규칙 정의
- 드론 및 레이저스캐너를 활용한 근대 건축물 문화재 빌딩정보 모델 역설계 구축에 관한 연구
- 건설산업에서의 3D 스캐닝 활용
- 앤서니 타운센드의 스마트시티에 대한 소고
- 학술대회 참관기
- 학회소식
- 회원가입 소개
- 2019년 BIM 솔루션 동향 - 건설 자동화
- 제4차 산업혁명과 건축설계의 진화
- NWW 오피스 계획을 위한 공간 사용 데이터 측정 연구 동향
- Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations
- 학회조직도
- 개인회원 및 특별회원사 명단
- BIM News
- 건축설계에서 융합설계를 위한 디지털 모델과 물리 모델의 역할과 상호보완성
참고문헌
관련논문
최근 이용한 논문
교보eBook 첫 방문을 환영 합니다!
신규가입 혜택 지급이 완료 되었습니다.
바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!