Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations

이용수 25

영문명
발행기관
한국BIM학회
저자명
김현주(Kim, Hyun-Joo)
간행물 정보
『KIBIM Magazine』9권 2호, 1~10쪽, 전체 10쪽
주제분류
공학 > 건축공학
파일형태
PDF
발행일자
2019.06.30
4,000

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by buildingSMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.

목차

ABSTRACT
1. Introduction
2. Implementating a procedure for automating daily resource leveling
3. Case study
4. Refinement
5. Conclusion
Acknowledgements
References

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

김현주(Kim, Hyun-Joo). (2019).Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations. KIBIM Magazine, 9 (2), 1-10

MLA

김현주(Kim, Hyun-Joo). "Schedule Optimization in Resource Leveling through Open BIM Based Computer Simulations." KIBIM Magazine, 9.2(2019): 1-10

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제