본문 바로가기

추천 검색어

실시간 인기 검색어

학술논문

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

이용수 46

영문명
Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics
발행기관
한국BIM학회
저자명
Kim JongHoon Cohen Fernando Castillo
간행물 정보
『KIBIM Magazine』5권 4호, 47~52쪽, 전체 6쪽
주제분류
공학 > 건축공학
파일형태
PDF
발행일자
2015.12.31
4,000

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

목차

ABSTRACT
1. BIM for Site Logistics Planning
2. Tools for Site Logistics Planning
3. Connector Bridge Delivery and Installation
4. Conclusion
Acknowledgments
References

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

Kim JongHoon,Cohen Fernando Castillo. (2015).Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics. KIBIM Magazine, 5 (4), 47-52

MLA

Kim JongHoon,Cohen Fernando Castillo. "Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics." KIBIM Magazine, 5.4(2015): 47-52

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제