본문 바로가기

추천 검색어

실시간 인기 검색어

학술논문

BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용

이용수 69

영문명
Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume
발행기관
한국BIM학회
저자명
정국영(Jung GukYoung) 우정원(Woo JeongWon) 강경돈(Kang KyeongDon) 신재철(Shin JaeChoul)
간행물 정보
『KIBIM Magazine』3권 3호, 9~18쪽, 전체 10쪽
주제분류
공학 > 건축공학
파일형태
PDF
발행일자
2013.09.30
4,000

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

목차

ABSTRACT
1. 서론
2. 물량산출 오차원인분석 및 수량산출서 자동화
3. BIM기반 건설정보분류체계(안)
4. BIM DB 활용
5. 결론
REFERENCES

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

정국영(Jung GukYoung),우정원(Woo JeongWon),강경돈(Kang KyeongDon),신재철(Shin JaeChoul). (2013).BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용. KIBIM Magazine, 3 (3), 9-18

MLA

정국영(Jung GukYoung),우정원(Woo JeongWon),강경돈(Kang KyeongDon),신재철(Shin JaeChoul). "BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용." KIBIM Magazine, 3.3(2013): 9-18

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제