Risk-Based Evaluation of Trenching Methods in Pipeline Installation with Pre & Post-Lay Trench Approaches to Improve Time and Cost Performance

이용수 2

영문명
발행기관
People & Global Business Association
저자명
Taufiq Yusuf Latief Reza Aulia
간행물 정보
『Global Business and Finance Review』Vol.29 No.9, 124~138쪽, 전체 15쪽
주제분류
경제경영 > 경영학
파일형태
PDF
발행일자
2024.10.31
4,600

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

Purpose: This study aims to provide information about the risk factors involved in trenching work and its mitigation. An analysis of the risk ranking, the relationship between the risk factors frequency (independent) and the impact on time and cost performance (dependent), and a correlation model between the independent and dependent variables are presented here. It is hoped that identifying risk factors and how to control them can be a reference for maximising the performance of trenching projects in Indonesia. Design/methodology/approach: Literature reviews and case studies were conducted to identify and collect the risk factors associated with these trenching works. A questionnaire was developed for expert validation of the risk factors and to gather the opinions of 30 respondents related to the frequency and impact level using a Likert scale. The homogeneity test, validation and reliability data, risk correlation, and model regression were performed using SPSS v29. Risk ranking and risk control analysis were performed using the Risk Matrix and the Level 2 Risk Assessment form. Findings: Three risks - the X19 survey result, the X22 trenching equipment availability, and the X24 vessel selection-remain at a moderate risk level. The other risks are considered to be insignificant residual risks with the mitigation provided. Research limitations/implications: Due to the country's limited equipment availability, the trenching contractor in Indonesia may encounter X22 as a technical challenge. Therefore, further research is required to provide the equipment database, including the availability and capacities related to seabed conditions, soil strength and water depth. Originality/value: This study provides information and analysis on prominent or relevant risks for both pre and post-lay trenching works in Indonesia

영문 초록

목차

Ⅰ. Introduction
Ⅱ. Literature Review
Ⅲ. Methodology
Ⅳ. Results and Discussion
Ⅴ. Conclusions, Limitations and Future Research
Funding Statement
Acknowledgment
References

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

Taufiq,Yusuf Latief,Reza Aulia. (2024).Risk-Based Evaluation of Trenching Methods in Pipeline Installation with Pre & Post-Lay Trench Approaches to Improve Time and Cost Performance. Global Business and Finance Review, 29 (9), 124-138

MLA

Taufiq,Yusuf Latief,Reza Aulia. "Risk-Based Evaluation of Trenching Methods in Pipeline Installation with Pre & Post-Lay Trench Approaches to Improve Time and Cost Performance." Global Business and Finance Review, 29.9(2024): 124-138

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제