본문 바로가기

추천 검색어

실시간 인기 검색어

학술논문

국방무기체계 획득영향요인 상호관계 분석

이용수 72

영문명
A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems :Focused on Factor Analysis of Naval Ship Acquisition Delay Cases
발행기관
한국산업경영시스템학회
저자명
황정오(Jeong-Oh Hwang) 오현승(Hyun-Seung Oh) 최봉완(Bong-Wan Choi) 임동순(Dong-Soon Yim)
간행물 정보
『산업경영시스템학회지』제43권 제4호, 48~58쪽, 전체 11쪽
주제분류
공학 > 산업공학
파일형태
PDF
발행일자
2020.12.30
4,120

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.

목차

1. 서 론
2. 함정무기체계 획득절차
3. 분석 절차 및 지연요인의 식별
4. 함정획득지연요인 상호관계 분석
5. 결 론
References

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

황정오(Jeong-Oh Hwang),오현승(Hyun-Seung Oh),최봉완(Bong-Wan Choi),임동순(Dong-Soon Yim). (2020).국방무기체계 획득영향요인 상호관계 분석. 산업경영시스템학회지, 43 (4), 48-58

MLA

황정오(Jeong-Oh Hwang),오현승(Hyun-Seung Oh),최봉완(Bong-Wan Choi),임동순(Dong-Soon Yim). "국방무기체계 획득영향요인 상호관계 분석." 산업경영시스템학회지, 43.4(2020): 48-58

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제