본문 바로가기

추천 검색어

실시간 인기 검색어

학술논문

Development of Standard Estimates for Garden Construction: Focused on Planting

이용수 60

영문명
발행기관
인간식물환경학회
저자명
Kwang-Pyo Hong Hyukjae Lee
간행물 정보
『인간식물환경학회지(JPPE)』제22권 제5호, 467~480쪽, 전체 14쪽
주제분류
자연과학 > 자연과학일반
파일형태
PDF
발행일자
2019.10.30
4,480

구매일시로부터 72시간 이내에 다운로드 가능합니다.
이 학술논문 정보는 (주)교보문고와 각 발행기관 사이에 저작물 이용 계약이 체결된 것으로, 교보문고를 통해 제공되고 있습니다.

1:1 문의
논문 표지

국문 초록

영문 초록

Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

목차

Introduction
Research Methods
Results and Discussion
Conclusion

키워드

해당간행물 수록 논문

참고문헌

교보eBook 첫 방문을 환영 합니다!

신규가입 혜택 지급이 완료 되었습니다.

바로 사용 가능한 교보e캐시 1,000원 (유효기간 7일)
지금 바로 교보eBook의 다양한 콘텐츠를 이용해 보세요!

교보e캐시 1,000원
TOP
인용하기
APA

Kwang-Pyo Hong,Hyukjae Lee. (2019).Development of Standard Estimates for Garden Construction: Focused on Planting. 인간식물환경학회지(JPPE), 22 (5), 467-480

MLA

Kwang-Pyo Hong,Hyukjae Lee. "Development of Standard Estimates for Garden Construction: Focused on Planting." 인간식물환경학회지(JPPE), 22.5(2019): 467-480

결제완료
e캐시 원 결제 계속 하시겠습니까?
교보 e캐시 간편 결제